Company Training "Big Water Drill"
 
By Firefighter Kevin Carr
June 10, 2019
 

The company training this month conducted by the Lieutenant's was a "Big Water" refresher/training. The volunteers laid out 400' of 5" hose from the Engine to the Tower using the big water set-up from a hydrant. Crews refreshed/trained on operating and setting up the Tower and the Engine for big water flow. Crews also refreshed/trained on the hydrant assist, portable hydrant, straight gate valve, pump pressures with elevation, hydrant operation and always hose packing 101. Training to protect and serve the citizens of Cambridge, Dorchester County MD.

 
Units: Chief 1, Engine 1-3, Engine 1-2, Tower 1